FAIL
Risk 2 (Medium)
Sep 12, 2011 Inspection
September 12, 2011• Consultation• 8 violations
Violation: 10. SEWAGE AND WASTE WATER DISPOSAL, NO BACK SIPHONAGE, CROSS CONNECTION AND/OR BACK FLOW - Comments: UTILITY SINK NEEDED WITH PROPER BACKFLOW DEVICE.(+7 more)